Service

Warehouse
installation
inspection

Professional technical inspection of racking, stacker cranes and SILO infrastructure — compliant with PN-EN 15635. Detailed inspection report and digital documentation of every component.

PN-EN 15635 compliant
SILO certification
Digital report 24/7
Why it matters

What happens when a warehouse runs without regular inspections?

Damaged racking and overloaded stacker cranes aren’t just a compliance issue — they represent a real risk of production downtime, accidents and costly legal liability. Missing inspection documentation puts companies at risk during health & safety audits and UDT inspections.

gpp_bad

Damage invisible to the naked eye

Dents, weld cracks and deformed upright posts can lead to sudden, cascading collapse — with no prior warning signs.

gavel

Legal risk and liability

PN-EN 15635 places a duty on operators to carry out regular inspections. No documentation = no proof of due diligence in the event of an accident.

schedule

Unplanned downtime

A racking or stacker crane failure during peak season means an entire zone shuts down. Prevention costs many times less than emergency repair and operational losses.

inventory_2

No technical condition records

Without regular reports, there’s no way to know which components are approaching the end of their service life. Budget planning for maintenance becomes impossible.

assignment_late

Problems during UDT and H&S audits

An external inspection without up-to-date inspection records results in a suspension of operations or an immediate repair order.

Racking inspection frequency per regulations
at least once a year
Inspection and report turnaround
1 visit + report within 48h
How it works

What does an inspection involve?

Three stages — from booking the visit to a digital report available in your client panel.

1

Site survey and inventory

The technician documents the warehouse layout, rack and installation types, stacker crane serial numbers, and the current load configuration. This forms the basis for a thorough assessment.

1–2 hours (depending on scale)
2

Technical inspection per PN-EN 15635

We check every structural element: uprights, beams, cross-members, anchor points, protective guards, anti-corrosion coating condition, and correct loading relative to load capacity labels.

On-site, same day
3

Report and repair recommendations

Within 48 hours you receive a detailed report with photos, damage classification (green / amber / red) and prioritised repair actions. The report is also available in your Hustro panel.

Report within 48h of visit
Nevel technician during a warehouse installation inspection
PN-EN 15635 European standard
48h Report after visit
RAL Damage classification
Inspection scope

What do we check during an inspection?

The inspection covers all types of warehouse structures — from pallet racking to advanced SILO stacker cranes.

view_week

Pallet and shelving racking

Inspection of uprights, beams, horizontal and vertical bracing, floor anchors, and load compliance with capacity labels.

factory

Stacker cranes and SILO

Inspection of rails, masts, carriages and gripper mechanisms. Special certifications required — our team holds them.

rotate_right

Carousel and vertical lift systems

Assessment of drive mechanisms, guide tracks, safety sensors and load-bearing components.

shield

Guards and protective equipment

Verification of upright protectors, rack-end guards, safety nets and warehouse zone markings.

foundation

Floor and anchoring

Assessment of the industrial floor condition in racking zones — cracks, voids and deformations affecting structural stability.

label

Labelling and documentation

Checking that load capacity labels, load distribution diagrams and previous inspection records are current.

Installation inspection — Nevel technician
Inspection report

What do you get after the inspection?

A detailed report with photos and prioritised actions — available in your Hustro panel as soon as the technician approves it.

photo_camera
Photo documentation

Every defect is photographed and described with its location in the warehouse. No ambiguity when quoting repairs.

traffic
RAL classification (green / amber / red)

Damage categorised as: safe to operate / requires monitoring / requires immediate repair.

format_list_numbered
Prioritised repair list

Action list with suggested order and estimated cost — ready to hand over to procurement or planning.

history
History in the Hustro panel

The report goes into the facility’s digital file — accessible 24/7 from any browser, no paper records to hunt down.

Hustro panel — inspection report
dashboard

Upload a screenshot
of the Hustro panel report

FAQ

Frequently
asked questions

How often should rack inspections be carried out?

+

PN-EN 15635 requires at least one formal inspection per year by a qualified inspector. For warehouses with heavy use (forklift traffic, seasonal peaks), we recommend inspections every 6 months. Daily visual checks should be carried out by a designated member of staff.

Does the inspection cover stacker cranes and SILO systems?

+

Yes. Our team holds special certifications for servicing and inspecting high-bay storage systems — stacker cranes, vertical lift systems and SILO infrastructure. This sets us apart from companies that only inspect standard pallet racking.

How long does a visit take, and when will I receive the report?

+

Visit duration depends on warehouse size — a typical facility of 1,000–3,000 m² takes 2–4 hours. The inspection report with photos and damage classification is delivered within 48 hours of the visit, directly to the Hustro panel and to the client’s email address.

What is RAL damage classification?

+

It’s a three-tier assessment system in line with PN-EN 15635: green — good condition, no restrictions on use; amber — damage requires monitoring or planned repair; red — component taken out of service immediately. Every colour-coded defect appears in the report with a photo and location.

Does Nevel also carry out repairs for defects found?

+

Yes — we offer an Inspection + Repair package where the same team performs the diagnosis and carries out the repair. Spare parts delivery is included in the service price. One contractor, one quote, no passing the buck.

Is the report accepted by the UDT and H&S inspections?

+

Our inspection report meets the documentation requirements of PN-EN 15635 and is accepted as proof of due diligence during UDT inspections and H&S audits. The report includes the inspector’s details, inspection date, methodology and results for each component.

Book an installation
inspection!

Free quote. Report within 48 hours of the visit.

Inspection compliant with PN-EN 15635
SILO stacker crane certification
Report with photos and RAL classification
Available digitally in the Hustro panel 24/7

Contact

email serwis@nevel24.pl
phone +48 691 707 505
phone +48 691 809 809
Get a free quote →